0

GREEN REST 5 stars

( 01 ) Next to the future international ski resort
( 02 ) Extension for 1 year without %
( 03 ) 30 bonus days of accommodation for the investor
( 04 ) Launch of the complex — Q4 2026
Investment calculator

About the Complex

The complex is located in the village of Nyzhnia Rozhanka, near Slavsko, in the Lviv region. Around there are mountains, a river, tall fir trees, silence and fresh air. Green Rest has everything you need for a year-round vacation, and the future GORO Mountain Resort ski resort, which is being built nearby, will be a nice bonus for guests. We are creating our own infrastructure and offering a lot of entertainment in any weather - the complex is self-sufficient and designed to provide comfort regardless of external factors.

  • 5

    years of experience in managing hotel complexes

  • <10%

    annual income from the investment amount

  • 136

    premium-class rooms with custom designer interiors

Leave an Application

Leave a contact our manager will contact you.






    Invest in hotel real estate    Invest in hotel real estate    Invest in hotel real estate   
    Invest in hotel real estate    Invest in hotel real estate    Invest in hotel real estate   

    hotel interior

    We combined design with the natural beauty of the area where the hotel is located.

    On the first floor, you will find a spa, restaurant, ski room, hair salon, children's room, reception, lounge bar, and lobby for the comfortable stay of guests.

    Infrastructure

    Wellness & SPA
    Outdoor Pool
    Conference room
    Restaurant
    Banquet hall
    Restaurant GRILL & BBQ
    Rest areas
    Summer pool-zone
    Children's Zone
    Sport
    Own parking

    The Wellness SPA relaxation area in the complex is available in any season, where youcan enjoy a 25-meter heated swimming pool and a children's pool, jacuzzi, baths, as well as indulge in a hammam, Roman bath, and herbal bath. The Wellness zone on the second floor allows you to restore your body's energy balance through a hay and salt room, cosmetology, massage, body wraps, and aromatherapy.

    Experience true relaxation in our outdoor pool, surrounded by the breathtaking landscapes of the Carpathians. Whether it’s a refreshing morning swim or an evening unwind under the stars, harmony with nature is always present here. The heated water provides comfort in any season, while the spacious lounge area with sunbeds creates the perfect atmosphere for rejuvenation.

    The hall for 60 people will accommodate any event near nature and mountainous terrain. The combination of business and leisure will allow you to reboot from the noisy city and be inspired not only by a bright spot, but also plunge into a relaxing mood.

    A large hall on the first floor with an exquisite menu from the chef, a buffet in the morning, a delicious lunch and a romantic dinner.

    The Green Rest banquet hall offers hotel guests not only delicious food, but also allows you to hold open-air wedding ceremonies, birthday parties, or business meetings for a large company on the sixth floor.

    The stunning aroma of grilled meat and unsurpassed taste sensations are all about our grill restaurant, which is located on the territory of the complex. Imagine: you are sitting in a secluded place surrounded by the unique nature of the Carpathians and on the table in front of you - the most delicious dishes cooked on the grill fire.

    On the grounds of the complex, spaces have been created for your comfort and inspiration: cozy walking paths with benches, a bridge over the river with picturesque views, a summer terrace of the restaurant, and a stage for hosting events and atmospheric evenings. Here, everyone will find their own way to relax and enjoy the Carpathians.

    In summer, you will find a pool area with an outdoor pool, bungalows and sunbeds. Summer chill in the middle of the mountains in the open air in the pool with a cocktail and music.

    There is always a place for your childrenin any weather. Playground in the freshair, as well as a separate roomin thehotel. Also on site you can rent a bikefor both children and adults, for a trip to the slopes of the picturesque Carpathians.

    For those who enjoy active recreation, a game of padel tennis awaits you on our sports court. You can also take in stunning mountain views from the windows of our gym and yoga area. The hotel also features a professional 25-meter swimming pool, ideal for training camps for swimmers.

    Free parking for investors and guests of the guarded hotel around the clock. 85 parking spaces will allow each guest to leave his car safe without obstacles.

    Resort

    Regional Development

    The new all-season international level GOROMountain Resort, which OKKO Group is building on an area of nearly 1200 hectares, enhances the investment attractiveness of theregion. The resort near the villages of Volosyanka and Verkhnyaya Rozhanka, just 5km from Slavske, promises to become a tourist magnet thanks to 41 ski trails totaling 75 km, lifts, and recreational facilities.

    Purchasing apartments in our hotel provides investors with access to a stable flow of tourists year-round due to proximity to GOROMountain Resort. This ensures a high occupancy rate and an increase in property value alongside the development of the resort and infrastructure.

    Apartments

    • Standard
      Apartments

      A one-room unit for two people with a corridor, wardrobe, and bathroom. There are two layout options available – with a balcony and without. The design is executed in a loft style with wood accents that highlight the nature surrounding the hotel.

      1-room apartment

      A one-room unit for two people with a corridor, wardrobe, and bathroom. There are two layout options available – with a balcony and without. The design is executed in a loft style with wood accents that highlight the nature surrounding the hotel.

    • Family Studio
      Apartments

      A one-room unit for three people with a corridor, enlarged wardrobe, and bathroom. Perfect for couples with a child.

      A one-room unit

      A one-room unit for three people with a corridor, enlarged wardrobe, and bathroom. Perfect for couples with a child.

    • De Luxe
      Apartments

      A one-room unit with a sofa, enlarged wardrobe, and bathroom with an additional bathtub. A luxurious room that provides comfort after a long journey.

      A one-room unit

      A one-room unit with a sofa, enlarged wardrobe, and bathroom with an additional bathtub. A luxurious room that provides comfort after a long journey.

    • Premium
      Apartments

      A two-room unit In this cozy two-room apartment, not only families but also their friends can relax. The unit includes a large bedroom, a living room with a sofa, an enlarged wardrobe, a corridor, and a bathroom.

      A two-room unit

      A two-room unit In this cozy two-room apartment, not only families but also their friends can relax. The unit includes a large bedroom, a living room with a sofa, an enlarged wardrobe, a corridor, and a bathroom.

    • Chalet

      Two-story apartments with a large terrace A family-type chalet with touches of mountain nature. Two-story apartments with a large terrace overlooking the river, a studio kitchen, a living room with a sofa, two bedrooms, and two bathrooms on each floor

      Two-story apartments with a large terrace

      Two-story apartments with a large terrace A family-type chalet with touches of mountain nature. Two-story apartments with a large terrace overlooking the river, a studio kitchen, a living room with a sofa, two bedrooms, and two bathrooms on each floor

    • Family Suite

      Spacious two-room apartments, perfect for family vacations. The rooms feature a bathroom for maximum comfort.

      A two-room unit

      Spacious two-room apartments, perfect for family vacations. The rooms feature a bathroom for maximum comfort.

    • Junior Suite

      Modern one-room apartments with extra space for the convenience of guests. Ideal for couples or those seeking more space to relax.

      A one-room unit

      Modern one-room apartments with extra space for the convenience of guests. Ideal for couples or those seeking more space to relax.

    • Pet Friendly

      These apartments are specially designed for traveling with your pets. Guests with dogs are provided with a comfortable and convenient environment for shared relaxation.

      For guests with dogs

      These apartments are specially designed for traveling with your pets. Guests with dogs are provided with a comfortable and convenient environment for shared relaxation.

    • Inclusive

      The rooms are adapted for individuals with disabilities, ensuring easy access and comfort. Special equipment guarantees safety.

      For guests with disabilities

      The rooms are adapted for individuals with disabilities, ensuring easy access and comfort. Special equipment guarantees safety.

    Calculator

    Specify the area and floor — and instantly find out the price of the project

    Floor
    2 4 5
    Room area
    Standard (1-room, inclusive) 31.42 m2 Standard (1-room, pet-friendly) 28.81 m2 Premium (2-room, pet-friendly) 48.58 m2 Standard (1-room) 30.22 m2 Standard without balcony (1-bedroom) 27.46 m2 Premium (2-room) 42.98 m2 Premium (2-room) 50.9 m2 Standard (1-room) 24.64 m2 Standard (1-room) 30.22 m2 Premium (2-room) 42.98 m2 Junior Suite (1-room) 49.5 m2 Premium (2-room) 50.2 m2 Premium (2-room) 50.9 m2 Junior Suite (1-room) 54 m2 Family Suite (2-room) 65.19 m2 Family Suite (2-room) 74.8 m2
    Завантажити фінансову модель Завантажити фінансову модель
    Room rate
    Capitalization during construction
    Profit per year
    Profit per month
    Investment payback
    Annual return
    Завантажити фінансову модель Завантажити фінансову модель

    Management Company

    The management company will take care of your apartments, handle utility payments, and send profitability reports to apartment owners. The net profit from renting out the apartments is distributed according to the area of the owners' apartments and occupancy during the month.

    • Step / 001

      Choose your apartments

      We have prepared eight types of apartments in the hotel and separate two-story chalets on the riverbank for you.

    • Step / 002

      Sign the contract

      The management company will take care of your property. Your apartment will be regularly maintained by our team.

    • Step / 003

      Receive dividends

      Monthly, the management company provides a net profit report to the apartment owner andpays dividends quarterly.

    About the Developer

    The general contractor team of the project LLCSTROYINVEST KHERSON has been constructing multi-story buildings throughout Ukraine for 30 years. Today it specializes in building hotels, residential buildings, and shopping centers. The photo shows several examples of completed projects.

    Quality of Construction Green Rest

    We guarantee high quality of materials and workmanship at every stage.

    Ventilated facade

    Quality aluminum windows

    Walls made of ceramic blocks

    Reinforced concrete building frame

    3 passenger elevators from Kone

    Solid fuel boiler house

    Bio-purification system

    24/7 security of the territory

    Construction Progress

    April-May`2026

    Roofing of section 3 has begun

    Stonework of floor 4 of section 3 has been completed

    Stonework of floor 5 and 6 of section 3 has been started

    The hotel's heating boiler and pump station have been launched

    We are continuing work on internal electricity of section 2

    We are continuing installation of heating in section 2 of the hotel

    We are continuing installation of internal water supply and sewage in rooms

    We are continuing decoration of rooms in section 1

    We are continuing decoration of rooms in section 2 of the hotel

    We are continuing installation of hotel internet and television systems

    We are continuing installation of hotel swimming pool

    We are continuing work on internal air conditioning and ventilation of the hotel

    Work on fire protection has begun

    Work on the facade of section 1 and 2 of the hotel has begun

    We are continuing landscaping and landscaping of the hotel

    Glazing of sections 3 and 4 has been completed floors 3 sections of the hotel

    We have completed waterproofing the basement of the swimming pool

    March`2026

    Roofing of section 2 has begun

    Stonework of section 3 of floor 4 has begun

    We are continuing the installation of the hotel's boiler and heating pump station

    We have completed the work on the internal electricity of section 1 and have begun work on section 2 of the hotel

    We are continuing the installation of the heating of section 1 and have begun the installation of section 2 of the hotel

    We are continuing the installation of the internal water supply and sewage system of the rooms

    We are continuing the decoration of the rooms of section 1 of the hotel

    We are continuing the decoration of the rooms of section 2 of the hotel

    We are continuing the installation of the hotel's Internet and television systems

    We are continuing the installation of the hotel's swimming pool

    We are continuing the work on the internal air conditioning and ventilation of the hotel

    Work on fire protection has begun

    February`2026

    Roof beams of the 6th floor, section 3 have been poured

    Stone works have begun on the 3rd floor, section 3

    We are continuing to install the hotel's boiler and heating pump station

    We are continuing to work on the hotel's internal electrical system

    We are continuing to cover the restaurant floor of section 1 with ceramic tiles

    We are continuing to install the metal visor of section 1

    We are continuing to install the heating of section 1 of the hotel

    We are continuing to install the internal water supply and sewage system of the rooms

    We are continuing to finish the rooms of section 1

    We have started to finish the rooms of section 2 of the hotel

    We have started to install the hotel's Internet and television systems

    We have started to install the hotel's swimming pool

    We have started to work on the hotel's internal air conditioning and ventilation

    January`2026

    Filled slab 5 over 3 sections

    Started with a vertical structure of 6 on top of 3 sections

    We can extend the roof beams 6 on top 2 sections

    They started the stones, robots 2 on top of 3 sections

    We continue to install the boiler room and pumping station for the hotel.

    We continue to work with internal electrical systems in hotels

    Continued covering of the restaurant's 1 section with ceramic tiles

    Continued installation of metal canopy 1 section

    Continued installation of scorching 1 section of the hotel

    We continue the installation of internal water supply and sewerage systems in the rooms

    We continue to add rooms in section 1

    Room upgrades have begun in section 2 of the hotel

    Continued cleaning of the swimming pool pit

    December`2025

    Floor slab poured on 4th floor, 3 sections

    Vertical structures poured on 5th floor, 3 sections

    Vertical structures of the hotel entrance group poured

    Flooding slab of the hotel entrance group poured

    Finished stonework on 5th floor, 2 sections

    Finished stonework on 6th floor, 1 section

    We continue to install the hotel's heating boiler and pump station

    We continue to work on the hotel's internal electrical system

    We continue to arrange the parking lot

    We continue to arrange the external rainwater drainage systems

    We have started to cover the restaurant floor in 1 section with ceramic tiles

    We continue to install the metal canopy in 1 section

    We continue to install the heating in 1 section of the hotel

    We continue to install the internal water supply and sewage system in the rooms

    We continue to work on landscaping the hotel's territory

    We continue to install the hotel's external lighting

    We continue to install the roof hotel

    November`2025

    Floor slab poured on 3rd floor, 3 sections

    Vertical structures poured on 4th floor, 3 sections

    Vertical structures poured on 6th floor, 2 sections

    Foundations of the hotel entrance group poured

    Finished stonework on 4th floor, 2 sections

    Began stonework on 5th floor, 2 sections

    Began stonework on 6th floor, 1 section

    Finished stonework on 1st floor, 2 sections

    We continue installation of the hotel's heating boiler and pump station

    We continue work on the hotel's internal electrical system

    We continue installation of parking

    We continue installation of external rainwater drainage systems

    Began tiling the restaurant floor of 1 section with ceramic tiles

    We continue facade work on the Chalet and 1 section

    We continue installation of the metal visor of 1 section

    We continue installation of the heating system 1 section of the hotel

    We continue to install the internal water supply and sewage system of the rooms

    We continue to work on landscaping the hotel area

    We continue to install the hotel's outdoor lighting

    We have begun installing the hotel roof

    October`2025

    Floor slab poured on 2nd floor, 3 sections

    Vertical structures poured on 3rd floor, 3 sections

    Floor slab poured on 5th floor, 2 sections

    Finished stone work on 3rd floor, 2 sections

    Began stone work on 4th floor, 2 sections

    Continued stone work on 1st floor, 2 sections

    Continued installation of the hotel's heating boiler and pump station

    Continued work on the hotel's internal electrical system

    Continued parking arrangement

    Continued installation of external rainwater drainage systems

    Finished tiling the floors of rooms on 2nd floor, 1 section with ceramic tiles

    Continued facade work on Chalet and 1 section

    Continued installation of metal visor, 1 section

    Began installation of heating system of 1 section of the hotel

    Began installation of internal water supply and sewage system of rooms

    Work started from landscaping the hotel area

    Began laying the hotel's outdoor lighting

    September`2025

    Beams under the roof of the 6th floor of section 1 were poured

    Vertical structures of 4th floor, 2 sections have been poured

    Floor slab of 4th floor, 2 sections has been poured

    Finished stone work of 2nd floor, 2 sections

    Continued stone work of 1st floor, 2 sections

    Continuing installation of the hotel's heating boiler and pump station

    Continuing work on the hotel's internal electrical system

    Continuing installation of parking

    Continuing installation of external rainwater drainage systems

    Began tiling the floors of rooms of 2nd floor, 1 section with ceramic tiles

    Continuing facade work of Chalet and 1 section

    Finished installation of the roof of the restaurant and boiler room

    Began installation of the metal visor of 1 section

    August`2025

    Vertical structures of 3rd floor, 2 sections have been poured

    Floor slab of 3rd floor, 2 sections has been poured

    Vertical structures of 1st floor, 3 sections have been poured

    Floor slab of 1st floor, 3 sections has been poured

    Vertical structures of 2nd floor, 3 sections have been poured

    Finished stone work of 5th floor, 1 section

    Began stone work of 1st and 2nd floors, 2 sections

    Installing windows of 5th floor, 1 section

    Continuing installation of the boiler and pump station of the hotel's heating

    Continuing work on the hotel's internal electrical system

    Continuing installation of parking

    Continuing installation of external rainwater drainage systems

    Completed installation of floor soundproofing and installation of plasterboard partitions of bathrooms in rooms 2-4 of floor 1 section

    Completed installation of underfloor heating 2-4 floor 1 section

    Semi-dry screeds 2-4 floors 1 section completed

    Facade work on Chalet and 1 section started

    Roofing of restaurant and boiler room started

    Metal structure of boiler room pipe installed

    June-July`2025

    Completed vertical structures of 6th floor, 1 section

    Filled floor slab of 1st floor, 2nd section

    Filled vertical structures of 2nd floor, 2nd section

    Filled floor slab of 2nd floor, 2nd section

    Filled foundation arrangement of 3rd section

    Filled floor of 1st floor, 3rd section

    Began stone work of 5th floor, 1st section

    Filled installation of windows of 4th floor, 1st section

    Began installation of windows of 5th floor, 1st section

    Continuing installation of boiler and pump station of heating of the hotel

    Continuing work on internal electrical equipment of the hotel

    Continuing arrangement of parking

    Continuing arrangement of external rainwater drainage systems

    Completed installation of soundproofing of the floor and installation of plasterboard partitions of bathrooms in rooms 2-4th floor, 1st section

    Completed arrangement underfloor heating 2-3 floors 1 section

    Preparation of work for semi-dry screed 2-3 floors 1 section

    Finishing the furnishing of the Chalet, the final stage

    April-May`2025

    The floor slab of the 5th floor of the 1st section of the hotel has been poured

    The installation of vertical structures of the 6th floor of the 1st section of the hotel has begun

    The installation of the foundations of the 2nd section of the hotel has been completed

    The installation of the floor slab of the 1st floor of the hotel has begun

    We are finishing the installation of the foundations of the 3rd section of the hotel

    The stone work of the 3rd and 4th floors of the 1st section of the hotel has been completed

    The installation of windows of the 3rd floor of the 1st section of the hotel has been completed

    The concrete base for the summer terrace of the restaurant has been poured

    We are continuing the installation of the boiler and pumping station for the heating of the hotel

    We are continuing the work on the internal electrical system of the hotel

    We are continuing the work on the decoration of the Chalet, we are waiting for the cabinet furniture

    We are continuing the installation of the hotel parking

    We are continuing the installation of external rainwater drainage systems

    We have begun the installation of soundproofing of the floor of the 2nd floor of the hotel, 1st section and the installation of plasterboard partitions bathrooms in the rooms

    March`2025

    We continue the finishing work of the hotel

    We continue the installation of underfloor heating and screed on the first floor of the hotel

    We have completed the stone work of the 3rd floor of the 1st section of the hotel

    We have completed the installation of windows on the 2nd floor of the hotel

    We continue the installation of the foundations of the hotel of the 2nd and 3rd sections

    We continue the installation of the boiler and pump station of the heating of the hotel

    We continue the work on the internal electrical system of the hotel

    We continue the finishing work of the Chalet, we have completed the laying of the carpet

    We continue the installation of the hotel parking

    We have poured the floor slab of the 4th floor of the 1st section

    We continue the installation of the external rainwater drainage systems

    February`2025

    We continue finishing work on the hotel

    We continue installing underfloor heating and screed on the first floor of the hotel

    We have completed the stonework of the 2nd floor of the 1st section of the hotel

    We have started the stonework of the 3rd floor of the 1st section of the hotel

    We have installed the aluminum glazing systems of the restaurant

    Installation of windows on the 2nd floor of the hotel has begun

    We continue to install the foundations of the hotel sections 2 and 3

    We continue to install the hotel's boiler and heating pump station

    We continue to work on the hotel's internal electrical system

    We continue the work of finishing the Chalet, installed plumbing fixtures and interior doors

    We continue the arrangement of the hotel parking

    We poured the floor slab of the 3rd floor of the 1st section of the hotel

    We poured the columns and walls of the 4th floor of the 1st section of the hotel

    We began the arrangement of external rainwater drainage systems

    January`2025

    We continue the finishing work of the hotel

    We continue the installation of underfloor heating and screed on the first floor

    We continue the stone work of the 1st floor of the hotel

    We continue the stone work of the 2nd floor of the hotel

    We have poured the basement ceiling of the swimming pool

    We have poured part of the columns of the 1st floor of the 3rd section

    We continue the arrangement of the foundations of the hotel of the 2nd section

    We continue the installation of the boiler and pump station of the hotel heating

    We continue the work on the internal electrical system of the hotel

    We continue the work on the finishing of the Chalet, laying ceramic tiles, puttying the walls

    We continue the arrangement of the hotel parking lot

    We have poured the columns and walls of the 3rd floor of the 1st section of the hotel

    December`2024

    We continue the finishing works of the hotel

    We continue the installation of warm floors and screeds on the first floor

    We continue the stone work of the 1st floor of the hotel

    The stone work of the 2nd floor of the hotel has begun

    The basement walls of the pool were flooded

    We continue the arrangement of the foundations of the hotel

    We continue the installation of the hotel's boiler and pump heating station

    We continue work on the internal electricity of the hotel

    We continue the work of decorating the Chalet, laying ceramic tiles, and started puttingty on the walls

    We are continuing the arrangement of the hotel's parking lot

    The restaurant floor slab was poured

    Part of the floor slab of the 1st floor of the 2nd section was poured

    November'2024

    We continue the finishing work of the hotel

    Started the installation of warm floors and screeds on the ground floor of the hotel

    We continue the stone work on the 1st floor of the hotel

    Poured a slab of pool foundations

    We continue to arrange the foundations of the hotel

    We continue the installation of boiler and pump station heating hotel

    Mounted the hotel switchboard and connected it to external networks power supply

    We continue to work on the internal electricity of the hotel

    We continue the work of finishing Chalet, began laying ceramic tiles

    We continue the arrangement of hotel parking

    October'2024

    We continue the finishing works of the hotel

    We continue the stone work of the first floor of the hotel

    The floor slab of the 2nd floor of one section of the hotel was poured

    We continue arranging the foundations of the hotel

    Installation of the hotel's boiler and pump heating station has begun

    They started planting new trees and bushes on the hotel territory

    We continue work on the internal electricity of the hotel

    We continue the work of decorating the Chalet

    We continue to arrange the hotel's parking lot

    September'2024

    The cleaning of technical areas has been completed

    The preparation of the walls and the walls of the technical premises has been completed

    Continuing stone works 1 on top of the hotel

    Work has begun on cleaning the slab 2 on top of one section of the hotel

    We continue to work on cleaning the internal and external sewerage systems of the hotel

    We continue to work on the improvement of the territory

    Internal electrical work of the hotel has begun.

    Continued robotic improvement of the Chalet

    Cleaning up of the hotel parking lot has begun